CASE STUDY

    SECTOR

    Architecture Engineering and Construction

    Satellite view

    Source: Bentley Systems

    use-of-digital-twin-enhances-plant-operation-efficiency-by-50

    image

    Source: Bentley Systems

    Project Details

    A USD 6 billion plant was constructed in China's Leting Economic Development Zone in Tangshan, aiming to become an advanced, green, and intelligent modern factory. With an annual output exceeding seven million tons of iron and steel, the project emphasized intelligent manufacturing and the application of green technologies to promote energy conservation and emission reduction, contributing to clear water and blue skies for the 2022 Beijing Winter Olympic Games. MCC Capital Engineering & Research Incorporation was responsible for designing, procuring, and constructing all equipment and processing facilities, covering a vast area of 534 hectares, including 42 plants and a 26-kilometer roadway.



    Solutions
    Product Used

    Value Propositions

    Return on Investment (RoI)
    Geo_icon
    GeographyAsia-Pacific

    Location_icon
    CountryChina

    Project_owner
    Project Owner

    MCC Capital Engineering & Research Incorporation Limited (CERI), China


    Project_stakeholder_icon
    Project/Technology Stakeholder

    Bentley Systems, Incorporated


    Project_cost_icon
    Project CostUSD 6 billion


    Technology Used
    Sector Focus
    SDGs
    Recognition/ Awards

    © 2025 Copyright: Geospatial Resource Platform

    Geospatial Media and Communications Pvt. Ltd.