CASE STUDY

    SECTOR

    Architecture Engineering and Construction, Natural Resources and Environment

    Satellite view

    Source: IndustriALL Global Union

    up-to-usd-two-million-saved-in-costs-through-infrastructure-analytics-and-modeling-in-the-dzhamgyr-gold-processing-plant-project

    image

    Source: IndustriALL Global Union

    Project Details

    The Dzhamgyr Gold Processing Plant project was initiated in Kyrgyzstan near the Kara-Bura Mountain pass to establish a closed cycle of gold production. With an investment of USD 75 million, the project aimed to construct a main factory building along with ancillary services infrastructure, including a crushing and screening complex, laboratory, storage pond, tailings storage facility, poison and ore storage areas, shift camps, and new roadways.



    Solutions
    Product Used

    Value Propositions

    Return on Investment (RoI)
    Geo_icon
    GeographyAsia-Pacific

    Location_icon
    CountryKyrgyzstan

    Project_owner
    Project Owner

    AAEngineering Group


    Project_stakeholder_icon
    Project/Technology Stakeholder

    Bentley Systems, Incorporated


    Project_cost_icon
    Project CostUSD 75 million

    Calendar_icon
    Completed Year/Projected Completion YearNot Available