    Project Details

    The A465 Heads of the Valleys Section 5 & 6 project in Wales, spearheaded by FCC Construcción, represents a milestone in road infrastructure enhancement, involving the widening of 17 km of roadway and the construction of 29 bridges, 19 retaining walls, 6 overpasses, and 3 pedestrian bridges. Initially, GIS technology was limited to environmental consulting, but the scale and complexity of the project, compounded by a lack of interconnection between massive datasets, such as BIM models, point clouds, drone imagery, and inspection data, demanded a more holistic approach. By leveraging Esri's advanced GIS technology, FCC transformed the project into a fully interconnected and traceable operation. GIS and BIM integration facilitated seamless data accessibility, robust monitoring systems, and collaborative tools, enabling project stakeholders to overcome data silos and manage the project with unprecedented precision.



    Solutions
    Product Used

    Value Propositions

    Return on Investment (RoI)
    Geo_icon
    GeographyEurope

    Location_icon
    CountryUK-Wales

    Project_owner
    Project Owner

    FCC Construcción, SA (FCC)


    Project_stakeholder_icon
    Project/Technology Stakeholder

    Esri Espana



    Technology Used
    Sector Focus
    SDGs
    Recognition/ Awards