Case Study

    Case Study

    Streamlining Modular Design and Construction Using BIM Solution for the SINO Iron Ore Project

    Sector | Architecture Engineering and Construction|Geography | Asia-Pacific|Country | Australia

    Streamlining Modular Design and Construction Using BIM Solution for the SINO Iron Ore Project

    image

    Source: Kerman Contracting Pty Ltd.

    Project Details

    The SINO iron ore project, located in the remote Pilbara region of northwestern Australia, stands as the largest monomer mining endeavor in the Australian resources sector. With a substantial investment of USD 10 billion, the project encountered notable challenges in design, construction, and communication due to disparities between Chinese and Australian construction standards and management concepts. NETC was entrusted with the delivery of this monumental project, necessitating highly precise installation and transport methods, coupled with comprehensive design, engineering, and construction strategies.



    Solutions
    Product Used

    Value Propositions

    Return on Investment (RoI)
    Geo_icon
    GeographyAsia-Pacific

    Location_icon
    CountryAustralia

    Project_owner
    Project Owner

    Northern Engineering & Technology Corporation,MCC


    Project_stakeholder_icon
    Project/Technology Stakeholder

    Bentley Systems, Incorporated


    Project_cost_icon
    Project CostUSD 10 billion


    Technology Used
    Sector Focus
    SDGs
    Recognition/ Awards