    Project Details

    In Bucharest, Romania, an innovative project sought to build the city's inaugural residential structure over subway tunnels, introducing distinctive challenges due to its placement within the tunnel protection zone. SAIDEL Engineering assumed responsibility for both structural and geotechnical design, with a primary goal of minimizing the effects on tunnel displacement and structural forces. Faced with the necessity of subway operator approval due to an irregular footprint, SAIDEL ingeniously adapted the structure's shape to align with functional and architectural requirements, successfully overcoming a two-year setback caused by a previous project rejection. The project's focal point rested on the swift and inventive development of excavation plans and foundation design to secure approval and expedite progress.



    Solutions
    Product Used

    Value Propositions

    Return on Investment (RoI)
    Geo_icon
    GeographyEurope

    Location_icon
    CountryRomania

    Project_owner
    Project Owner

    Metrorex


    Project_stakeholder_icon
    Project/Technology Stakeholder

    SAIDEL Engineering SRL; Bentley Systems, Incorporated


    Project_cost_icon
    Project CostUSD 2.7 million (approx.)

    Calendar_icon
    Completed Year/Projected Completion YearNot Available

    Technology Used
    Sector Focus
    SDGs
    Recognition/ Awards