    Project Details

    The Hampton Lumber Mill in Willamina, Oregon is building a storm retention system and pond to pump all storm runoff, replacing an existing pond on the other side of the mill.

    The project, which has two phases, started in mid-August 2022. The pond's preparation, excavation, and material removal comprised the first phase, which is now finished. Approximately ten thousand cubic yards of material have been removed and excavated thus far. The installation of pipe utilities and the running of the storm line comprise the second phase, which will start shortly.



    Solutions
    Product Used

    Value Propositions

    Return on Investment (RoI)
    Geo_icon
    GeographyNorth America/Central America/Caribbean

    Location_icon
    CountryUSA

    Project_owner
    Project Owner

    Pihl Inc.


    Project_stakeholder_icon
    Project/Technology Stakeholder

    Datumate



    Technology Used
    Sector Focus
    SDGs
    Recognition/ Awards

    © 2025 Copyright: Geospatial Resource Platform

    Geospatial Media and Communications Pvt. Ltd.