CASE STUDY

    SECTOR

    Architecture Engineering and Construction

    Satellite view

    Source: Microsoft

    klang-valley-mrt-project-asias-first-bim-level-2-developer-enhancing-public-transport-by-40

    image

    Source: Microsoft

    Project Details

    The second line of the Klang Valley MRT Project (KVMRT) comprises a 57.7-kilometer connectivity line, featuring 44.2 kilometers of elevated track and an underground tunnel spanning 13.5 kilometers. The first phase of the Metro Rail project in Kuala Lumpur, encompassing a total of 36 stations – 27 elevated and 9 underground – was meticulously developed. This ambitious metro initiative is poised to cater to the commuting needs of approximately 2 million residents, encompassing Kwasa Damansara, the southern suburban areas, and Putrajaya, the eminent federal administrative center.



    Solutions
    Product Used

    Value Propositions

    Return on Investment (RoI)
    Geo_icon
    GeographyAsia-Pacific

    Location_icon
    CountryMalaysia

    Project_owner
    Project Owner

    Mass Rapid Transit Corporation Sdn. Bhd.


    Project_stakeholder_icon
    Project/Technology Stakeholder

    MMC Gamuda; AECOM; Mott MacDonald; Bentley Systems, Incorporated; Esri


    Project_cost_icon
    Project CostUSD 7.19 billion

    Calendar_icon
    Completed Year/Projected Completion YearKajang Line- 2017, SSP Line- 2023

    Technology Used
    Sector Focus
    SDGs
    Recognition/ Awards