    The Tuen Mun-Chek Lap Kok Link (TMCLKL) project in Hong Kong aimed to enhance road connectivity by linking critical destinations such as the Hong Kong Boundary Crossing Facilities, the Hong Kong – Zhuhai – Macao Bridge, and the International Airport. Golder Associates Hong Kong spearheaded the geotechnical design and analysis for dual tunnels in the challenging southern landfall of the BCF reclamation area. In the face of intricate ground conditions encompassing fill, soft marine deposits, alluvium, decomposed granite, and rock, they meticulously engineered segmental tunnel linings beneath the southern landfall, taking into account recent reclamation effects and residual settlement to ensure a robust design.



    Solutions
    Product Used

    Value Propositions

    Return on Investment (RoI)
    Geo_icon
    GeographyAsia-Pacific

    Location_icon
    CountryChina

    Project_owner
    Project Owner

    Government of the Hong Kong Special Administrative Region


    Project_stakeholder_icon
    Project/Technology Stakeholder

    Golder Associates Hong Kong Ltd.; Arup; Bentley Systems, Incorporated


    Project_cost_icon
    Project CostUSD 6.1 billion

    Calendar_icon
    Completed Year/Projected Completion Year2020

    Technology Used
    Sector Focus
    SDGs
    Recognition/ Awards

    © 2025 Copyright: Geospatial Resource Platform

    Geospatial Media and Communications Pvt. Ltd.