CASE STUDY

    SECTOR

    Architecture Engineering and Construction, Natural Resources and Environment

    Satellite view

    Source: Bill Brown’s Bridges

    fugros-role-in-safeguarding-izmit-bay-bridge-construction-navigation-seismic-challenges

    image

    Source: Bill Brown’s Bridges

    Project Details

    The Izmit Bay Bridge, a three-kilometer-long suspension bridge, was under construction in a highly seismically active region, where the Anatolian and Eurasian plates intersected. This area, which experienced two major earthquakes in 1999, was characterized by deep deposits of soft, unstable, and liquefiable soils. Fugro was selected by NÖMAYG to provide data collection, interpretation, and consultancy services for the construction contractors, ensuring reliable support. Given the urgency of the financing scheme, a challenging schedule of four months was set, underscoring the need for rapid execution.



    Solutions
    Product Used

    Value Propositions

    Return on Investment (RoI)
    Geo_icon
    GeographyMiddle East

    Location_icon
    CountryTurkey

    Project_owner
    Project Owner

    IHI Corporation; NÖMAYG Joint Venture (Nurol, Özaltın, Makyol, Yüksel and Gocay)


    Project_stakeholder_icon
    Project/Technology Stakeholder

    Fugro


    Project_cost_icon
    Project CostUSD 9 billion

    Calendar_icon
    Completed Year/Projected Completion Year2016

    Technology Used
    Sector Focus
    SDGs
    Recognition/ Awards