CASE STUDY

    SECTOR

    Architecture Engineering and Construction, Location-Based Services

    Satellite view

    Source: Woolpert

    enhances-urban-accessibility-through-rehabilitation-of-arlington-road-bridge

    image

    Source: Woolpert

    Project Details

    Ohio Department of Transportation (ODOT) District 7 sought to rehabilitate a highly skewed bridge, MOT-70 Arlington Road Bridge, while widening roadways and ensuring compliance with stringent vertical clearance standards. Leveraging advanced geospatial technologies like mobile mapping systems and Lidar, alongside meticulous CAD integration, the project achieved remarkable feats in design optimization and construction sequencing. Through the strategic use of these tools, the project not only minimized disruption with efficient maintenance of traffic plans but also delivered cost-effective solutions, surpassing stakeholder expectations. The collaborative efforts of the Ohio Department of Transportation (ODOT), the City of Brookville, and various stakeholders culminated in a successful endeavor that not only enhanced urban accessibility but also set a benchmark for future infrastructure projects.



    Solutions
    Product Used

    Value Propositions

    Return on Investment (RoI)
    Geo_icon
    GeographyNorth America/Central America/Caribbean

    Location_icon
    CountryUSA

    Project_owner
    Project Owner

    Ohio Department of Transportation (ODOT)


    Project_stakeholder_icon
    Project/Technology Stakeholder

    City of Brookville; Ohio Contractors Association; Innovative Pavement Institute (IPI); Woolpert


    Project_cost_icon
    Project CostUSD 5.4 million

    Calendar_icon
    Completed Year/Projected Completion Year2020

    Technology Used
    Sector Focus
    SDGs
    Recognition/ Awards

    © 2025 Copyright: Geospatial Resource Platform

    Geospatial Media and Communications Pvt. Ltd.