Efficiency in Rail Infrastructure: L&T's Success with Technology in WDFC Package CTP-14

Source: Equipment India
Larsen & Toubro Limited constructed the Alignment of Package CTP-14 (Rewari-Dadri Section) of the Western Dedicated Freight Corridor. CTP-14 is a 128 kms long Package involving the design and construction of civil, buildings and track works, electrical & mechanical works, and signalling & telecommunication works for double line electrified track. The project also includes an overhead catenary system that can operate at a maximum train speed of 100 Km/h, with an initial axle load of 25.0 tonnes. Formation and bridge structures will be provided for a 32.5-tonne axle load and the track structure for a 25-tonne axle load.

Dedicated Freight Corridor Corporation of India Ltd., A Govt. of India Enterprise

Larsen & Toubro Limited; Bentley Systems, Incorporated