CASE STUDY

    SECTOR

    Architecture Engineering and Construction, Energy and Utilities

    Satellite view

    Source: Equipment India

    efficiency-in-rail-infrastructure-l-and-ts-success-with-technology-in-wdfc-package-ctp14

    image

    Source: Equipment India

    Project Details

    Larsen & Toubro Limited constructed the Alignment of Package CTP-14 (Rewari-Dadri Section) of the Western Dedicated Freight Corridor. CTP-14 is a 128 kms long Package involving the design and construction of civil, buildings and track works, electrical & mechanical works, and signalling & telecommunication works for double line electrified track. The project also includes an overhead catenary system that can operate at a maximum train speed of 100 Km/h, with an initial axle load of 25.0 tonnes. Formation and bridge structures will be provided for a 32.5-tonne axle load and the track structure for a 25-tonne axle load.



    Solutions
    Product Used

    Value Propositions

    Return on Investment (RoI)
    Geo_icon
    GeographyAsia-Pacific

    Location_icon
    CountryIndia

    Project_owner
    Project Owner

    Dedicated Freight Corridor Corporation of India Ltd., A Govt. of India Enterprise


    Project_stakeholder_icon
    Project/Technology Stakeholder

    Larsen & Toubro Limited; Bentley Systems, Incorporated


    Project_cost_icon
    Project CostUSD 445 million (approx.)

    Calendar_icon
    Completed Year/Projected Completion Year2021

    Technology Used
    Sector Focus
    SDGs
    Recognition/ Awards