BIM Technology Advancements in Constructing the Ultra-Deep Water Transmission Tunnel of the Pearl River Delta Project

Source: WSP
The Pearl River Delta Water Resources Allocation project represents the largest water conservancy undertaking in Guangdong province, China. Spanning 113.2 kilometers, the water transmission tunnel lies 70 meters beneath the surface. This ambitious project aims to enhance water supply security, bolster capacity, and drive regional development.

Ministry of Water Resources, People's Republic of China

China Railway 18TH Bureau Group Co. Ltd.; Bentley Systems, Incorporated; SuperMap Software Co., Ltd.