CASE STUDY
SECTOR
Architecture Engineering and Construction
Source: GW Prime
bim-puts-delhi-metro-phase-iv-project-on-track
Source: GW Prime
Phase 4 Delhi Metro Project was finalised in 2015 and its construction, 103.93 km in length, started in 2019. With 45 stations on the stretch, it has 3 priority corridors: Aerocity to Tughlakabad, R.K. Ashram to Janakpuri West and Mukundpur to Maujpur and a total of 45 stations. This phase of metro for Delhi is said to be the last extension of the existing metro network and the Silver line will increase connectivity towards the airport.
Delhi Metro Rail Corporation (DMRC)
Government of National Capital Territory of Delhi, India; CCECC (China Civil Engineering Construction Corporation); KEC International Ltd; Techture
Geospatial Media and Communications Pvt. Ltd.