Case Study

    Case Study

    Advanced BIM Solutions Saves 1600 hours of Design Time and USD 500,000 in Costs in Highway Projects

    Sector | Architecture Engineering and Construction|Geography | North America/Central America/Caribbean|Country | USA

    Advanced BIM Solutions Saves 1600 hours of Design Time and USD 500,000 in Costs in Highway Projects

    image

    Source: EPC World

    Project Details

    University Avenue, a crucial two-mile, six-lane highway in Cedar Falls, Iowa, serving over 20,000 vehicles daily, faced deteriorating infrastructure and safety concerns. The city initiated a USD 38.9 million modernization initiative to revitalize the corridor, aiming to enhance traffic flow, safety, and multimodal accessibility while minimizing costs and operational expenses. Foth Infrastructure and Environment collaborated with city stakeholders to develop a comprehensive transportation plan, integrating innovative design elements such as roundabouts and complete street approaches.



    Solutions
    Product Used

    Value Propositions

    Return on Investment (RoI)
    Geo_icon
    GeographyNorth America/Central America/Caribbean

    Location_icon
    CountryUSA

    Project_owner
    Project Owner

    Foth


    Project_stakeholder_icon
    Project/Technology Stakeholder

    Bentley Systems, Incorporated


    Project_cost_icon
    Project CostUSD 38.9 million


    Technology Used
    Sector Focus
    SDGs
    Recognition/ Awards